Preconstruction Approach

Preconstruction Approach

Using O誰eal痴 integrated design and construction capabilities, our team works together from the initial assessment phase to prepare a preliminary design that focuses on reducing overall project cost and schedule while maintaining the optimum level of quality for our clients. Our design and construction professionals coordinate the important factors that make the preconstruction effort a success, including:

  • Identifying project definition and cost as early as possible
  • Optimizing the preliminary site plan developed in the assessment phase
  • Identifying and correcting for constructability issues from the very beginning with multiple site and design constructability reviews
  • Identifying and acting upon design, permitting and procurement issues that can impact the overall construction schedule and budget
  • Identifying and incorporating value engineering elements related to the overall project, including:  building design, utilities equipment sizing, electrical distribution, controls and instrumentation simplification, process equipment layout, and optimized pipe routing

All while spending our time and your money as if it were our own!